Thomas Construction Group delivered a 20,200 SF warehouse on a two-acre site within an existing industrial park in Wilmington, NC. Designed to support the administration and distribution of Trane air-conditioning equipment, the facility includes 1,600 SF of office space integrated within the warehouse.
The fully sprinklered building features a 24-foot clear height, four tractor-trailer loading docks, and two service docks for efficient operations. Its brick front elevation with storefront windows and doors adds a professional appearance to the highly functional industrial facility.






















